Brainboxes PX-246 Especificações Página 57

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 82
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 56
Operation
57
6.5 MANUAL MODE
NOTE:
NOTE:NOTE:
NOTE:
If
IfIf
If
a digital input configured to
a digital input configured to a digital input configured to
a digital input configured to
panel lock
panel lockpanel lock
panel lock
is active,
is active, is active,
is active, changing module modes will
changing module modes will changing module modes will
changing module modes will
not be possible. Viewing the instruments and event logs is NOT affected by panel lock.
not be possible. Viewing the instruments and event logs is NOT affected by panel lock. not be possible. Viewing the instruments and event logs is NOT affected by panel lock.
not be possible. Viewing the instruments and event logs is NOT affected by panel lock.
Manual mode is activated by pressing the button.
In MANUAL
mode, the module actives an output to give a start signal to an external generator
controller (if S2 is configured as a generator supply), and if required, change the state of the load
switching devices. An LED indicator beside the button confirms this action.
6.5.1 STARTING SEQUENCE
NOTE:
NOTE:NOTE:
NOTE:
There is no
There is no There is no
There is no
start delay
start delaystart delay
start delay
in this mode of operation.
in this mode of operation.in this mode of operation.
in this mode of operation.
As soon as the MANUAL
mode button is pressed, the output to give a start signal to an external
generator controller is activated (if S2 is configured as a generator)
If the generator fails to start during the ‘S2 Fail Delay’ timer, an alarm will appear on the display which
shows Fail to Start. S2 is seen as available once the supply is within limits (if configured as a mains
supply) or had achieved loading voltage and frequency (if configured as a generator).
6.5.2 S2 AVAILABLE
In MANUAL
mode, the load is not transferred to S2 unless a ‘loading request’ is made and the S2
supply is within limits (if configured as a mains supply) or achieve loading voltage and frequency (if
configured as a generator).
A loading request can come from a number of sources.
Pressing the CLOSE/OPEN S2
button
S1 supply out of limits
Activation of an auxiliary input that has been configured to remote start on load
Activation of the inbuilt exercise scheduler if configured for ‘on load’ runs.
NOTE:
NOTE: NOTE:
NOTE: The load transfer signal remains inactive until
The load transfer signal remains inactive until The load transfer signal remains inactive until
The load transfer signal remains inactive until S2 is seen as available
S2 is seen as availableS2 is seen as available
S2 is seen as available. This
. This . This
. This
prevents
prevents prevents
prevents loading to a supply that has failed or is not
loading to a supply that has failed or is not loading to a supply that has failed or is not
loading to a supply that has failed or is not yet available
yet availableyet available
yet available.
..
.
As the load increases and decreases, the module may (depending upon configuration) remove non-
essential loads. This is configured as part of the Load Shedding control settings in the DSE
Configuration Suite Software.
See section entitled Load Shedding elsewhere in this document for further details.
Vista de página 56
1 2 ... 52 53 54 55 56 57 58 59 60 61 62 ... 81 82

Comentários a estes Manuais

Sem comentários